Introduction of case studies for the Silent Vacuum Drainage System (2)
Even if there are no drainage pipes nearby and the piping route is uneven, drainage is still possible! (At a certain station building)
**Renovation Case at a Certain Station (Shizuoka Prefecture)** (1) Requirements We wanted to drain the station office, platform shop, and restaurant, but there were no drainage pipes nearby. (2) Specific Reasons for Hindrance to Requirements The drainage pipe route to connect to the drainage pipe was uneven, making it impossible to use a pump-up system. (3) Specific Design We adopted an SVD system to suction drainage to the platform with a drainage pipe. ▼ Vacuum Unit - System Decision Due to space constraints, we adopted the non-continuous suction I-2 type vacuum unit. - Installation Location Decision Installed on the existing drainage pipe platform with a fenced enclosure. ▼ Vacuum Pipeline - Route Decision The installation route was planned only through the uneven piping route under the train tracks. - Vacuum Tube Consideration A vacuum tube (pipe) was installed independently from the vacuum unit. ▼ Detection Pit - Installation Location Decision Station Office: 450×450×400H Platform Shop: 350×350×350H Restaurant: 350×450×550H - Capacity Consideration Since there is one vacuum collection tank, we planned the suction water level and alarm water level to ensure no disruption to drainage even when the system is stopped.
- 企業:ジエス
- 価格:Other